Apex Companies

Construction Scheduler

Apex Companies(27 days ago)

Brentwood, CAOnsiteFull TimeJunior$48,000 - $52,000Operations
Apply Now

About this role

Apex Companies is hiring a SWIMS Scheduler to support field operations within its erosion control, street sweeping, and dewatering services. The position is with a fast-growing engineering and environmental consulting firm that emphasizes professional development, stability, and comprehensive benefits. The role is best suited to a reliable, detail-oriented candidate who will remain with the company long term and contribute to its continued growth.

View Original Listing

Required Skills

  • Scheduling
  • Dispatching
  • Inventory Tracking
  • Materials Ordering
  • Equipment Management
  • Fleet Readiness
  • Job Tagging
  • Customer Service
  • Safety Compliance
  • Reporting

+2 more

Qualifications

  • GED or High School Diploma
  • OSHA HAZWOPER (Preferred)
  • Safeland Training (Preferred)
  • First Aid Certification
  • CPR Certification
Apex Companies

About Apex Companies

apexcos.com

Apex Companies, LLC is a consulting and engineering firm specializing in water, environmental, health & safety (H&S), compliance, and infrastructure services. They deliver multidisciplinary solutions including site assessment and remediation, water and wastewater engineering, permitting and regulatory compliance, and H&S program support for public and private clients. Apex combines technical engineering, field services, and regulatory expertise to manage projects from planning and design through implementation and operations. Their teams focus on practical, compliance-driven approaches to solve environmental and infrastructure challenges.

ApplyBlast uses AI to match you with the right jobs, tailor your resume and cover letter, and apply automatically so you can land your dream job faster.

© All Rights Reserved. ApplyBlast.com